| 1. | Prefabricated timber formwork beams - requirements , classification and assessment 预制木构架梁.要求分类和评定 |
| 2. | Prefabricated timber formwork beams - requirements , classification and assessment 预制木模板梁.要求分类和评定 |
| 3. | Application of construction products in structures - part 2 : prefabricated timber formwork beams 结构中建筑产品的应用.第2部分:预制的木材模板梁 |
| 4. | Prefabricated timber formwork beams - requirements , classification and assessment ; german version en 13377 : 2002 预制的木材模板梁.分类和评估要求;德文版本en 1337 |
| 5. | In 1999 , 5 schools in tseung kwan o successfully used " system design formwork " and substituted the traditional timber formwork with precast construction and metal formwork 一九九九年,将军澳共有5间学校成功采用系统设计板模,并以预制方式和钢模取代传统的木板板模。 |
| 6. | In the construction of residential quarters at lee on road which has a repetitive floor plan , system aluminium formwork instead of the conventional timber formwork has been adopted 在利安道宿舍的工程中,因为每层的平面图设计相同,所以采用了系统式铝模,以取代传统的木板板模。 |
| 7. | Through the use of off - site fabricated steel members and slip - form construction for concrete core walls , the construction time was considerably shortened , the standard of workmanship controlled and the use of timber formwork eliminated 使用预制钢铁组件及可移动板模兴建混凝土主墙,可显著缩短工程时间,加强控制施工标准及减少使用木材板模。 |